AI-powered site intelligence, deal strategy, and objection handling for commercial solar.AI-powered BD intelligence for commercial solar.
Postcode triggers live PVGIS solar data and DNO region lookup.
Instant screening calculators. Indicative only — not a design.
Battery storage screening for a PV system. Sizes to soak up exported surplus.
Screening estimate from annual figures. Firm sizing needs half-hourly consumption data. Battery adds G99 scope and fire-safety siting requirements (ventilation, separation, detection).
Workplace EV charging feasibility against the site supply.
All EV connections are notifiable to the DNO (ENA process). The Workplace Charging Scheme pays up to £500 per socket (up to 40 sockets) until 31 March 2027 — check eligibility. Confirm maximum demand from half-hourly data before design.
Lighting retrofit savings — the fastest payback on most commercial sites.
At 27p/kWh blended commercial rate. Excludes emergency-lighting compliance work and control gains (PIR/daylight dimming typically add 15-30% further savings).
What the incoming supply can actually host — before anyone drives to site.
Indicative screening using nominal supply capacity. G98: ≤3.68 kW per phase connect-and-notify. Above that is a G99 application. Export limits depend on the DNO's network — check the capacity map for the postcode.